Texas Tech University, Student Union Building Phase II

Lubbock, Texas

Firm

Texas Tech University Facilities Planning and Construction

Client

Texas Tech University Facilities Planning and Construction

Area

154,680 sq.ft.

Total Cost

$29,328,343

Completion Date

03/2005

The phase II renovation of the Texas Tech Student Union Building was funded by an increase in student fees approved by the student body and followed a 90,000-square-foot addition completed in
phase I.
The project encompassed 85,000 square feet of the existing building and a new 125-seat dining pavilion. The design concept focused on opening up spaces to bring daylighting into the building. It also continued the significant architectural “blue wall” feature into the existing building, which was used to pull the building into one composition from the past five expansions of the facility. Specific amenities of the phase II renovation:
-Food court renovation with seven franchised and branded food concepts, including Sbarro’s, Taco Mayo, Steak Escape, Chick-Fil-A and Union Grill.
-A 125-seat dining pavilion addition.
-Retail corridor housing a branch bank; convenience store; ID office; retail postal and shipping service; and as many as four additional retail units.
-New and renovated meeting rooms.
-Reflection rooms for individual use.
-Renovated lounges and public spaces.

Additional Information

Associated Firm

Holzman Moss Architecture

Cost per Sq Ft

$189.00

Featured in

2006 Educational Interiors

Interior category

Cafeterias/Food-Service Areas

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...