Grace McWayne Elementary School and Hoover-Wood Elementary School

Batavia, Illinois

Firm

ARCON Associates

Client

Batavia Community Unit School District 101

Area

59,000 sq.ft.

Total Cost

$7,500,000

Completion Date

08/2001

When Batavia Community Unit School District 101 decided to build two new elementary schools, it wanted to create architecturally significant buildings that would inspire faculty and students toward higher achievement throughout the next 100 years.
These 59,000-square-foot buildings are divided into “blocks,” which are defined on the exterior by changes in brick color. The two-story classroom wing has a gentle curve inside and out. The library is situated centrally to keep student travel to a minimum. It also features a cozy tiered story area, a head- end room, computer lab and individual study areas. An early-childhood center has been designed to be accessible directly from the main entrance of the building with three specialized classrooms, a motor-skills room and a conference room for team-teaching.
Each building has 26 classrooms, including the early-childhood center and kindergarten rooms. Each of the 21 general classrooms has removable partitions for team-teaching, and access to small pull-out rooms for conferences, observation, parent meetings and one-on-one study. Other amenities include music and art rooms, and a performance stage flanked by the gymnasium and multipurpose rooms.

Additional Information

Capacity

600

Cost per Sq Ft

$127.12

Featured in

2002 Architectural Portfolio

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...