Cathedral High School Addition and Renovations
St. Cloud, Minnesota
ATSR created a STEAM addition for an existing urban campus. The addition made a flowing connection between two existing buildings set at multiple levels. The double-story commons is the new hub of the building and is filled with natural light and takes advantage of beautiful views overlooking the nearby Mississippi River.
Students can work collaboratively in small group rooms or break out into a variety of seating arrangements in the commons and the overlooking balcony. Transparency and overhead doors create connections between classrooms and into the commons.
The addition includes five science labs, two art studios, maker space, classrooms, administration, student commons, staff lounge, and school chapel. Math classrooms are nearby in the existing building.
ATSR provided architectural, mechanical, electrical, technology, interior design, and construction administration services. During the planning phase, ATSR gave tours of existing schools to test concepts in educational design with the staff, students and overseeing committee. Interactive computer models were used to develop and visualize the design options.
Additional Information
Associated Firm
IMEG; VAA
Cost per Sq Ft
$384.00
Featured in
2022 Educational Interiors Showcase
Category
Renovation
Interior category
Technology/STEM Centers
Other projects from this professional
Momentum: Minnetonka Design and Skilled Trades
ATSR designed an addition for Momentum: Minnetonka Design and Skilled Trades. The...
Cathedral High School STEAM Addition
Design Team Dean S. Beeninga, Peter Lacey, Kara Rise, Blayne Parkos, Nick Achina A...
North Branch District Education Center
The kindergarten addition and Early Childhood Learning renovation at the North Branch...
Tri-City United High School Classroom Addition/Alterations
ATSR conducted a district-wide master plan study with involvement from a 50-member...
Load more