C.V. Starr Intermediate School

Brewster, New York

Firm

DMR Architects

Client

Brewster Central School District

Area

56,000 sq.ft.

Total Cost

$8,200,000

Completion Date

01/1998

January 1998 was an exciting month for the students, faculty and administration of the Brewster Central School District. On a cold, rainy morning, nearly 600 enthusiastic fourth- and fifth-grade students and staff participated in the ceremonies officially opening the school. Challenging site conditions were overcome with the construction of this 56,000-square-foot addition, which connects to the district’s middle school.
The educational program, developed in collaboration with the administration, staff and architects, includes 800-square-foot classrooms, media center, art room, cafeteria, gymnasium and discovery science classroom. Technology is integrated throughout the school with networked computer workstations and cable television connections in every classroom.
Custom-designed teaching stations in the classrooms boast brilliant colors and geometric shapes stimulating students’ minds, and achieving the district’s educational and functional objectives for technology and traditional instruction.
The design provides flexibility to conduct simultaneous instruction for two to three classes of almost 80 students. Wider corridors in key areas provide additional large-group instruction.

Photographer: ©Norman McGrath

Additional Information

Cost per Sq Ft

$146.00

Featured in

1998 Educational Interiors

Interior category

Classrooms

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...