Angleton High School CTE
Angleton, Texas
As part of a 2019 bond package for Angleton ISD, PBK was tasked with designing a new Angleton Technology Education (CTE) Center. The new 127,715-square-foot center is on Angleton ISD High School’s campus and was built to accommodate an enrollment increase in the district’s CTE curricula of over 1,100 additional students in one academic year.The new building houses programs for culinary arts, horticulture, vet tech, ag fabrication, engineering/robotics, welding, construction sciences, digital design/AV production, health sciences, information technology, entrepreneurship, education, and law enforcement. Cosmetology, vet tech, and culinary arts accommodate direct patronage access from the community.
Additional Information
Capacity
650
Cost per Sq Ft
$338.00
Featured in
2023 Architectural Portfolio
Interior category
Technology/STEM Centers
Other projects from this professional
Del Valle Early College High School and P-Tech
Design team James Fauver (Project Architect); Daniel De La Garza (Project Designer) The Del...
Cypress Fairbanks ISD Visual and Performing Arts Center
The new Visual and Performing Arts Center is a centrally situated event...
Cypress-Fairbanks ISD Visual and Performing Arts Center
The new Visual and Performing Arts Center is a centrally situated event...
C.W. Cline Elementary School
Cline Elementary School is a preK–5 campus designed through a collaborative process...
Load more