Zach Elementary School

Fort Collins, Colorado

Firm

RB+B Architects, Inc.

Client

Poudre School District R-1

Area

63,550 sq.ft.

Total Cost

$6,577,000

Completion Date

08/2002

In May 2000, Poudre School District sponsored a competition for the development of a prototype three-round K-6 elementary school. Along with traditional education and technical specifications, the finalists were given the district’s new sustainable-building guidelines.
The plan incorporates a diagonal corridor dividing the school into passive and active zones. Classrooms face the passive zone. The gymnasium and flex room/cafeteria face the playground and ball fields, or active zone. Classrooms are grouped in threes and stacked, facing north and south to employ “cool-daylighting.” This carefully integrated micro-load approach resulted in a connected lighting load of 0.8 watts per square foot and a total cooling load (supported by an ice-storage system) of 60 tons—about half that of a comparable conventional school. Outside, landscape features were placed strategically to break up parking and paved playgrounds, thus buffering the building from heat sinks.
The environmentally responsible design also expresses itself in “buildings that teach.” Real-time energy use is displayed, and structural and mechanical systems are exposed to view. Products made from recycled materials are used throughout the building.

Additional Information

Capacity

550

Cost per Sq Ft

$103.00

Featured in

2003 Architectural Portfolio

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...