Windward School Innovation & Arts Center
Los Angeles, California
Design team
John Fisher, AIA; Faye Liu, ASA; Duke Jackels, AIA; Hanan Asfoury; Joe Monteadora, AIA
The Windward School Innovation Center project is designed to support interdisciplinary learning in the arts, sciences and entrepreneurship. The center features a 250-seat theater and recital hall, an acoustically tunable environment, along with orchestra and choir rehearsal rooms, innovation studios, classrooms and a gallery-style lobby. Situated on Windward School’s Los Angeles campus, the project was designed by John Sergio Fisher & Associates and built by Turner Construction to align with the school’s mission of fostering creative, collaborative and future-ready education.
The facility supports performance and academic functions in a site-sensitive design that blends architectural innovation with educational purpose. Acoustic systems were tailored to provide reverberation times adjustable from 1.4 to 2.1 seconds, ensuring optimal sound quality across multiple uses. The center serves as a hub for student performances, project-based learning and community engagement.
New facilities: Theater and recital hall, rehearsal spaces, innovation labs, classrooms and gallery lobby.
Enhanced systems: Tunable acoustics, digital AV systems, and performance infrastructure designed to support artistic and academic programming.
Additional Information
Cost per Sq Ft
$1,076.00
Featured in
2025 Architectural Portfolio
Interior category
Auditoriums/Music Rooms
Other projects from this professional
San Bernardino High School Auditorium Renovation
The San Bernardino High School Auditorium project has modernized the historic 1920s...
Crane Country Day School Wolf Theatre Renovation
The project scope consists of the renovation of the existing Cate Hall...
Moreno Valley High School Performing Arts Center
Design Team John Fisher, AIA; Joaquin Varela Ferrer, AIA; Faye Liu, ASA; Duke...
Dr. Martin Luther King Jr. Middle School Modernization
The Dr. Martin Luther King Jr. Middle School administrative building was constructed...
Load more