Wilmington Middle/High School

Wilmington, Ohio

Firm

Fanning Howey

Client

Wilmington City Schools

Area

103,488 sq.ft.

Total Cost

$8,379,316

Completion Date

09/2000

Wilmington Middle/High School successfully addressed several complex challenges in updating the aging facility’s program spaces and systems. The highlight is a 16,539-square-foot auditeria addition positioned between the high school gymnasium and the middle-school cafeteria and gymnasium.
The infill location of the 7,444-square-foot auditeria enables both schools to share a new main food-service space, converted from an existing locker room. The tiered space seats 566 for performances and 252 for dining. It features carpet, portable round tables, and a full-fly stage with a scene shop and dressing rooms.
The modernization also included more than 86,000 square feet of renovated space. The existing high school kitchen and cafeteria were converted into labs, classrooms and a large-group instruction space.
The installation of an advanced, energy-efficient HVAC system included a direct-digital-control electronic building-automation system, variable-volume pumping and two new water chillers. A warm brick blend on the exterior helped to unify the new and existing structures, while creating a bold new focal point along the front elevation.

Additional Information

Cost per Sq Ft

$110.00

Featured in

2002 Educational Interiors

Interior category

Multipurpose Rooms

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...