Westerly Middle School

Westerly, Rhode Island

Firm

Kaestle Boos Associates

Client

Westerly Public Schools

Area

148,500 sq.ft.

Total Cost

$24,400,000

Completion Date

09/2005

The intent of Westerly’s Vision 20/20 Initiative was to alleviate overcrowding and provide a long-term plan to improve all school facilities in the town of Westerly. Phase I included the design and construction of the new Westerly Middle School. The new grade 6 to 8 school is separated into pods with each having two entrances, four classrooms, a science laboratory, teacher conference room and common room. Each grade occupies one floor within the school. Additional features include a 400-seat auditorium, 335-seat cafeteria, media center and high school-sized gymnasium. The auditorium and cafeteria include measures for acoustical control, and the art classrooms include a kiln and computer stations for graphic arts.
Color is used throughout the facility, beginning at the front and driving through each pod to the rear exterior of the school. Each color reflects the different geometries used throughout the building and represents the three different grades within. Westerly Middle School meets the objectives of Vision 20/20, providing the needed space for both current and future enrollments in a state-of-the-art environment.

“Well-planned small learning communities. Nice use of color consistent throughout the building.”–2007 jury

Additional Information

Capacity

1,000

Cost per Sq Ft

$164.00

Citation

Middle School Citation

Featured in

2007 Architectural Portfolio

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...