Weldon E. Howitt Middle School, Building Addition

Farmingdale, New York

Firm

John A. Grillo, Architect PC

Client

Farmingdale Union Free School District

Area

48,700 sq.ft.

Total Cost

$9,000,000

Completion Date

02/2002

The Farmingdale Union Free School District needed an addition to add sixth-grade students to Howitt Middle School.
The only buildable area on the existing site was a large front lawn area at the southeast corner of the site. Therefore, the addition was sited in front of the existing building, in essence giving the building a new front facade. The existing building also houses the district administrative offices with the main entrance to the school through the administration suite. The main entrance is now through the addition, and the former main entry serves as an entry for administrative offices.
The classrooms were designed with large areas of glass and high ceilings to take advantage of natural daylighting. A semi-enclosed courtyard was created between the new and existing building. The courtyard is visible and accessible from both floors of the new and original structures.
The media center is the focal point of the addition. Its curved facade acts as the hinge point between the new and existing building. The stack area is a double-height space along the southeast facade. The media center has an adjacent fiction room and computer lab, all accessible from within the main space. The main floor reading area also can be used as an instructional area. A partial second floor is used as a multimedia room for videoconferences and instruction. The media center was furnished with reading chairs and window seats to provide a welcoming environment.

Additional Information

Cost per Sq Ft

$185.00

Featured in

2004 Architectural Portfolio

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...