Ty Williams Memorial Pavilion
Wake Forest, North Carolina
Design team
Jim Sherrer, Jr., AIA (Principal In Charge); Jonathan Medlin AIA, LEED AP (Project Architect); Trevor Cundiff (REVIT Modeler); Fluhrer-Reed (Structural); Crenshaw Consulting Engineers (MEP); Miramonte Studio (Landscape Design), Integrity Services Group
The Ty Williams Memorial Pavilion is the latest addition to Southeastern Baptist Theological Seminary’s historic campus. The venue was constructed to complement the beautiful campus and facilitate conversation while providing a space for study, fellowship, and reflection. Nestled amongst century-old oak trees, pines, and magnolias and the Georgian campus buildings, the venue offers a park-like environment, important in our post-Covid world.
The structure features a wood deck ceiling and slightly curved beams; they add a sculptural aesthetic reminiscent of the old trees recently removed. Large stone columns with sconce lighting, concrete flooring, metal roofing, LED lighting, ceiling fans, and interchangeable seating with tables create a space students want to visit. A fountain and landscaping add to the natural outdoor experience. The adjacent courtyard provides a venue for small campus events.
The pavilion is named for Ty Williams, who tragically died at age 11 on Nov. 12, 2020. Ty is the son of Travis and Liz Williams. Travis is a Southeastern alum and longtime staff member who serves as the associate vice president of facilities. A permanent marker is on the site.
Additional Information
Cost per Sq Ft
$472.00
Featured in
2023 Architectural Portfolio
Category
Community Center/Joint Use
Interior category
Community Centers/Joint-Use Facilities
Other projects from this professional
Clover Garden School
This rural site outside Burlington, North Carolina, provides a naturally beautiful setting...
The CHESS Building (The Communication and Health, Exercise & Sports Science) Building
Design team Jim Sherrer, Jr. AIA (Principal In Charge); Tom Wells AIA, LEED...
Shepherd Park Community Center
Design Team Contractor: MCN Build (Design-Build Contractor); Dan Triman (LEED Consultant); Genesys Impact...
St. David’s School, Middle School and Library
Design Team: Tom Wells, AIA LEED AP, VP (Principal); Camilo Peña, AIA...
Load more