Twin Lakes CTE Building
Monticello, Indiana
Design team
Tecton; Lynch, Harrison, & Brumleve; Primary Engineering
Twin Lakes School Corporation identified a need to upgrade its high school career and technical education (CTE) program facilities and consolidate all students in one building. Working closely with the Facilities Planning Committee, the team set out to design leading-edge facilities that enable and promote education and hands-on learning for new manufacturing jobs that require high-level technical skills, such as CAD/CAM, pneumatics, hydraulics, engineering, production technology and programming computer numerical control (CNC) equipment. The facility was designed to house a health sciences lab, welding lab and automotive lab. The final exterior design has a pre-engineered metal building structure that maximizes the building area within the project’s budget parameters.
Additional Information
Capacity
379
Cost per Sq Ft
$347.00
Featured in
2025 Architectural Portfolio
Category
Specialized
Interior category
Technology/STEM Centers
Other projects from this professional
Edgewood Early Childhood Center
The Edgewood Early Childhood Center is a new facility designed to support...
Lawrenceburg High School Media Center Renovation
Nestled in the heart of Lawrenceburg, Indiana, Lawrenceburg High School boasts a...
Lawrenceburg High School Additions & Renovations
Design team Primary Engineering; Lynch, Harrison, & Brumleve; Civil & Environmental Consultants In 2020,...
Shelbyville Middle School Black Box Theater
Once a natatorium, this transformed space now functions as a versatile black...