Troy South Middle School
Troy, Missouri
Design team: Hoener Associates, Inc. (Architect): Mark A. Reuther (Project Principal), Wade R. Welch (Project Architect); Cochran Engineering (Civil Engineer): Kurt Daniels (Project Principal); Toth & Associates, Inc. (Structural Engineer): Brian Orr (Project Principal); G&W Engineering (Mechanical, Electrical, Plumbing, Fire Protection Engineers): Kevin Griesemer (Project Principal)
Troy South Middle School was developed and constructed for Grades 6, 7, and 8 in the Lincoln County R-III School District in Troy, Mo. The facility accommodates administration and counseling suites; faculty offices and work areas; general classrooms; curriculum rooms for art, science, special education, and family and consumer science; a media center/library; a computer lab; an industrial technology lab; Project Lead the Way (PLTW) space; drama rehearsal space; and a music wing for band and choral programs. Activities spaces include a full gymnasium, locker rooms with coaches’ offices, and a fitness room. The music wing of the building is constructed as a storm shelter that meets ICC 500 and FEMA requirements.
General support spaces include food service, commons/cafeteria, general storage, mechanical and electrical rooms, data rooms, network room and office, as well as toilet facilities for the entire building.
The critical challenge for this project was to promote team-teaching areas for each grade that would house at least one core program per team, thus reducing travel time for students and creating a more intimate collaborative learning space.
Additional Information
Capacity
600
Cost per Sq Ft
$135.00
Featured in
2018 Architectural Portfolio
Other projects from this professional
Daniel Boone Elementary School Security Vestibule
Design team: Hoener Associates, Inc. (Architect): Mark A. Reuther (Project Principal), Wade...
Liberty High School
Design team: Hoener Associates, Inc. (Architect): Bruce Dell and Mark A. Reuther...
Troy Buchanan High School, Auditorium and FEMA Shelter
Design team: Hoener Associates, Inc. (Architect): Mark A. Reuther (Project Principal), Wade...
Farmington High School Gymnasium
Design team: Hoener Associates, Inc. (Architect): Mark A. Reuther (Project Principal), Wade...
Load more