Spring Creek Elementary School

Provo, Utah

Firm

Sandstrom Architecture

Client

Provo School District

Area

69,980 sq.ft.

Total Cost

$6,899,554

Completion Date

08/2002

To honor its commitment to build an elementary school in a specified area, the school board selected the only site available, which was steep and narrow. The challenge was placing the building in an area that was 337 feet deep with 60 feet of fall. The solution was a two-story design that was shallow in depth.
The design uses masonry-bearing walls with steel joists and frame. Exterior masonry is accented with an exterior insulation and finish system (EIFS). A stepped facade gives depth and rhythm to the design. Various types of block were used to add interest and to blend with the natural surroundings. Radius aluminum entry canopies, heavy block columns and solar green glazing enhance the building design.
All classrooms feature daylighting, and skylights are used extensively throughout the building. A spacious two-level entry with a suspended walkway is the school`s focal point.
A central boiler and chiller plant utilizes radiant heat, VAV boxes and digital energy management.

Additional Information

Capacity

800

Cost per Sq Ft

$98.59

Featured in

2003 Architectural Portfolio

AS&U Design Competitions