Slate Creek Elementary

Newton, Kansas

Firm

PBA Architects

Client

Unified School District No. 373, Kay Baker, Supt.

Area

53,400 sq.ft.

Total Cost

$3,749,251

Completion Date

11/1997

Slate Creek Elementary is one of 12 construction projects funded by a $28.3 million bond referendum and is the first elementary school built in this district since 1962. Slate Creek is a program prototype facility for the Newton School District that reflects significant changes in the delivery of elementary education.
This design has a multimedia emphasis and is linked with a computer learning lab, multimedia production area and media-distribution head-end room. This is the control and origination point for learning resources for the facility, which is also linked via wide-area network to other buildings in the district.
The facility is programmed around six grade levels that are divided into two grade clusters. A typical cluster includes six classrooms, four small-group rooms, a large wet/dry lab, restrooms and storage.
The building is primarily steel frame with brick veneer and metal skin. The exterior is clad in a mixture of red brick, blue standing-seam roofs and reflective galvalume horizontal metal siding.
The mechanical system is primarily dual-duct distribution from hot and cold air handlers on the roof. This system provides individual room control, reduced maintenance and diversity of zoning for energy efficiency.

Photographer: ©Heil Pettit

Additional Information

Associated Firm

Professional Engineering Consultants, Johnson Engineering, Montgomery Assoc.

Capacity

450

Cost per Sq Ft

$70.21

Featured in

1998 Architectural Portfolio

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...