Seattle Central Community College, Edison Building Renovations

Seattle, Washington

Firm

Schacht Aslani Architects

Client

Seattle Central Community College

Area

63,860 sq.ft.

Total Cost

$13,855,689

Completion Date

04/2010

The architect designed the renovations of about 165,000 square feet of Seattle Central Community College’s main campus building known as Broadway Edison. Part of the building consists of three buildings that were built between 1920 and 1940, called the Thomas A. Edison Technical School.

In the 1960s, a substantial addition known as the Broadway building was constructed, greatly expanding the original Edison structures to a total of 450,000 gross square feet. The intertwining of buildings from five construction phases made it difficult to renovate and provide a coherent system of public circulation for the urban campus.

A massive staircase in the center Edison building was rebuilt in steel to let more light from an existing skylight illuminate the first-floor public spaces. The renovation reorganized the loading dock, receiving and recycling areas to create a public corridor through the south Edison building and complete the circulation spine. The ground-floor renovation of the Broadway building improved the main corridor and access to the college’s center for student enrollment services.

The renovation of spaces for continuing-education and culinary-arts programs on the first and second floors of two of the Edison buildings is the most recent project.

Additional Information

Cost per Sq Ft

$216.00

Featured in

2010 Architectural Portfolio

Category

Renovation

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...