Santa Ynez Valley Union High School Multipurpose Room Modernization and Addition
Santa Ynez, California
Santa Ynez Valley High School was built in 1937. Measure K funds were used for campus-wide toilet room upgrades, HVAC and electrical system replacement, site underground utilities, fire alarm system replacement, roof and window replacement, as well as exterior parking and accessibility improvements.
Multipurpose room renovation: The architectural strategy was to enhance the historic building’s Mission-style detailing. An old stage was removed to enlarge the dining space, new lighting fixtures highlight the refurbished wooden beamed ceiling, large format porcelain tiles reference the nearby mission, and newly installed beadboard wall panels result in a modernized, historically sensitive space that serves as a student gathering space, dining hall, and foodservice court.
Addition: An existing covered exterior area was converted into a 1,400-square-foot indoor dining area that adjoins the renovated dining hall.
Exterior courtyard: An existing sunken courtyard was reconstructed at the same elevation as the multipurpose room to create an indoor-outdoor dining experience with a new shade structure. The new courtyard strengthens the center of the campus with greatly improved functionality.
Additional Information
Cost per Sq Ft
$354.00
Featured in
2021 Educational Interiors Showcase
Interior category
Multipurpose Rooms
Other projects from this professional
Riverside City College Life Science & Physical Science Reconstruction to Business Education & Computer Information Systems Project
The two-story Physical & Life Science Buildings were constructed in the mid-60s...
Mt. San Jacinto College Temecula Valley Campus
Mt. San Jacinto Community College District purchased a five-story facility to provide...
Mt. San Jacinto College, Temecula Valley Campus
Mt. San Jacinto Community College District purchased a 367,000-square-foot, five-story facility to...
Mark Richardson Career Technical Education Center & Agricultural Farm
Design Team Alan Kroeker (Principal-In-Charge); Federico Cortez (Project Architect); Above Grade Engineering (Civil...
Load more