Sandra Bales Walker Elementary School

Houston, Texas

Firm

CLR Architects/Engineers/Surveyors

Client

Cypress-Fairbanks Independent School District

Area

95,146 sq.ft.

Total Cost

$7,818,000

Completion Date

05/2000

The program required a 920-student, preK-5 school. Instructional areas were to have an open-concept environment with closed areas for special services, technology, art, music, physical education and science.
The solution is a linear plan organized into pods connected by a loop corridor. Pods are grouped around the learning resource center and technology labs. Each quadrant of the pod includes science, teacher workroom/storage and textbook storage. Activity areas are grouped opposite the administrative suite and separated from the remainder of the building by an entrance promenade. This promenade not only provides a sound separation, but also allows administrative personnel to monitor public entrances.
The site includes separate bus, automobile and special service drives; visitor/faculty parking spaces; physical-education hardscape; walking trail; playfields; and landscaping.
Construction includes a concrete foundation/slab, CMU, metal stud and demountable wall panels at interior walls with brick veneer exterior. The HVAC system is a combination of dual-duct variable-volume and constant-volume single zones with pretreated outside air, and two water-cooled screw chillers controlled by a building-automation system.

Additional Information

Capacity

920

Cost per Sq Ft

$82.17

Featured in

2001 Architectural Portfolio

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...