Ranch Heights Elementary Renovation

Bartlesville, Oklahoma

Firm

Ambler Architects

Client

Bartlesville Public Schools

Area

13,796 sq.ft.

Total Cost

$2,624,000

Completion Date

08/2010

The program called for a new early-childhood center, composed of four pre-K and four kindergarten classrooms. In addition, the entire early 1960s school was to receive an interior facelift.

The existing entry to the building was a continual problem: clashes between vehicular and pedestrian traffic and poor access to collector streets. The architect’s response was to add a new "front door" to the rear of the building, projecting a modern image and a glimpse of what awaited children inside. This new front door faces a collector street, and provides proper access for parents and visitors.

Existing 1960s hallways received new carpet, paint, ceilings and energy-efficient lighting. The hallway walls were organized and marked for efficient wayfinding. Space was provided for attractive, organized presentation of student work.

The early-childhood wing is at the new "front door" of the school, enabling efficient parent dropoff and pickup. Pre-K and kindergarten rooms are designed in pods of four classrooms around a common activity area, with natural light via skylights and north-facing windows.

Additional Information

Capacity

500

Cost per Sq Ft

$190.00

Featured in

2011 Architectural Portfolio

Category

Renovation

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...