Midland Public Schools, Central Park Elementary

Midland, Michigan

Firm

French Associates

Client

Midland Public Schools

Area

84,860 sq.ft.

Total Cost

$17,598,100

Completion Date

08/2017

Central Park Elementary was designed from the ground up as a tool for STEM education. The district’s use of Project Lead the Way (PLTW) curriculum directly influenced the design of the facility.
Unlike a typical school with individual classrooms along either side of a corridor, learning suites were developed for each grade level. These learning suites cluster five learning studios around a maker space and STEM studio. Each learning studio is opened to the maker space and STEM studios by a glass overhead door. The staff worked extensively prior to occupancy to embrace the openness of the building. Each learning suite also leads to an outdoor classroom area that provides play areas for the students and specific PLTW curriculum opportunities.
Building elements were intentionally exposed and labeled to help immerse students in a STEM environment.

Additional Information

Cost per Sq Ft

$207.00

Featured in

2018 Educational Interiors Showcase

Interior category

Common Areas

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...