McDonald Elementary School

Spokane Valley, Washington

Firm

Architects West, Inc.

Client

Central Valley School District

Area

46,539 sq.ft.

Total Cost

$4,703,070

Completion Date

07/2003

McDonald Elementary School was mid-1950s vintage with low-slope roofs of heavy timber construction. The existing mechanical system used unit ventilators in the classrooms.
Modernizations included asbestos abatement and the addition of sloped roof systems. The new sloped roof improves the aesthetics and provides an attic space to accommodate mechanical, electrical and communications systems. The sloped roofs also complement the surrounding residential neighborhoods.
The existing classroom spaces were remodeled completely. The space received new finishes, including ceilings, wall covering, paint, carpet and flooring. New casework in all classrooms included wardrobe and student cubbies, sink cabinets, map and poster storage, a technology center and movable storage cabinets.
The additions at McDonald were extensive. A new gymnasium, stage, multipurpose room, four new classrooms and administrative space make up about 16,000 square feet of new space.
Special consideration was given to separating pedestrian and vehicular traffic on site. Site improvements include bus dropoff lanes, parent dropoff lanes, staff parking areas, a visitor parking area, and hard- and soft-surface play areas.

Additional Information

Capacity

325

Cost per Sq Ft

$101.00

Featured in

2004 Architectural Portfolio

Category

Renovation

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...