Mahomet-Seymour High School

Mahomet, Illinois

Firm

BLDD Architects

Client

Mahomet-Seymour Community Unit School District No. 3

Area

102,500 sq.ft.

Total Cost

$8,701,400

Completion Date

08/2000

The Mahomet-Seymour School District wanted to take advantage of its high school expansion to create an image that reflects the strong civic pride in the school’s education, music and athletic programs.
The high school, situated in a small but growing community, received additions, including seven classrooms, four science rooms and expanded administrative areas to accommodate an enrollment that had grown from 850 to 1,100 students. A new 39,000-square-foot fieldhouse with attached weight-room and locker rooms facilitates the growing needs of the physical-education and athletic programs. The additions also showcase a new band room and choral room.
The original high school, constructed in 1980 using a pre-engineered metal building system, lacked character and identity. Placing additions on the most visible south and west sides of the school provided opportunity to improve this perception. While matching brick and roof slopes unite the additions with visible portions of the original school, a new massing vocabulary gives emphasis to the main entry, band room, weightroom and fieldhouse entry on the school’s southern front facade. Brick accent detailing and deep rib metal panels also contribute richness and strength.

“Good use of natural light, colors fit well. Logical addition with improved circulation space.”—2000 Architectural Portfolio jury

Photographer: ©Grussenmeyer’s Photography

Additional Information

Cost per Sq Ft

$84.89

Citation

Renovation/Modernization Citation

Featured in

2000 Architectural Portfolio

Category

Renovation

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...