Lakeview High School (Work in Progress)

Battle Creek, Michigan

Firm

BETA Design Group

Client

Lakeview Public Schools

Area

306,000 sq.ft.

Total Cost

$39,000,000

Completion Date

08/2005

“There is more information available outside of schools than inside of schools. If getting information were the sole function of schools, then schools would be antiquated. A school is not just bricks and mortar, but a social setting, a supportive, nurturing environment. We need school facilities that offer flexibility for multiple venues for learning,” says former superintendent Robert Spencer.
Responding to this challenge, Lakeview High School enables formal and informal learning to occur within this highly flexible facility.
The school is organized into learning villages of 150 students each that surround a multipurpose courtyard. These villages open onto the two-story media arbor—a media center without walls and flooded with daylight, which encourages student use and challenges accepted notions of what a high school media center should be.
The Arbor Trail is a great space that links the building’s activities, secures the building for community use, and provides informal learning opportunities.
Wireless technology enables learning to occur throughout, not just in classrooms. Daylighting permeates the facility and contributes to student achievement, health and energy efficiency.

“Flexible and adaptable teaching space gives the feeling of openness. Students will feel welcomed by the layout, light and concept.”–2004 jury

Additional Information

Capacity

1,200

Cost per Sq Ft

$128.50

Citation

Work in Progress Citation

Featured in

2004 Architectural Portfolio

Category

Work in Progress

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...