Kennard-Dale High School

Fawn Grove, Pennsylvania

Firm

Gilbert Architects Inc.

Client

South Eastern School District

Area

186,000 sq.ft.

Total Cost

$19,965,069

Completion Date

08/2001

Situated in rural southeastern Pennsylvania just north of the Maryland border, the new Kennard-Dale High School opened in 2001. Designed for grades 9 to12, this two-story, three-wing facility was built adjacent to the existing campus.
Branching off the center core area that houses a fully appointed 750-seat auditorium, a 4,700-square-foot media center, a writing laboratory, and an administrative suite, are two academic wings. These wings contain classrooms; science, business and computer laboratories; technical/trade shops; art rooms; a 13,560-square-foot, 1,400-seat, full-competition gymnasium; and cafeteria facilities.
The auditorium has a full-fly stage; catwalks for a double row of lights; a sound and lighting control room; retractable acoustical curtains to brighten or deaden sound and acoustical clouds designed for optimum, balanced sound distribution; a projection booth; and a performers’ green room. Using movable partitions, the gymnasium can be converted to three separate teaching stations.
Outdoor athletic facilities, which are shared with the middle schools, include an eight-lane all-weather track with a multipurpose in-field area that accommodates field hockey, football and soccer. Other fields include baseball, softball and field hockey.

Additional Information

Capacity

1,246

Cost per Sq Ft

$89.05

Featured in

2002 Architectural Portfolio

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...