Hebron Elementary School, Additions and Renovations

Hebron, Connecticut

Firm

C.J. Lawler Associates

Client

Town of Hebron

Area

59,700 sq.ft.

Total Cost

$6,000,000

Completion Date

02/2001

The program called for expanding the existing 35,000-square-foot elementary school, which was built in 1943 and had additions constructed in 1953, 1960 and 1987. As a result of the previous additions, the facility, which serves grades 4 to 6, did not have a cohesive floor plan. To address the projected population increase, the program called for nine new classrooms, a new gymnasium, auditorium, and a new instrumental and vocal music area.
The new L-shaped addition connects two ends of the existing building, forming an enclosed courtyard that unifies the facility. One end of the L is anchored by the gymnasium/auditorium and music complex, which can be separated from the rest of the facility when used after school hours for community use. The new addition is tied visually to the existing building through the use of the scale, form and material. Pitched roofs serve as a unifying element.
On the interior, lighting is used to enhance the environment. New classrooms are illuminated with natural light through operable windows and glass block panels. Natural light in the gymnasium/auditorium pours through large glass-block panels, but is controlled through the use of fibrous filter inserts and an electrically controlled shade. Corridors are lighted by a combination of natural daylight and indirect lighting coves behind lockers.

Additional Information

Capacity

400

Cost per Sq Ft

$170.00

Featured in

2002 Architectural Portfolio

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...