Hampton University, Student Center

Hampton, Virginia

Firm

Moody Nolan, Inc.

Client

Hampton University

Area

113,500 sq.ft.

Total Cost

$15,347,218

Completion Date

05/2001

The entrance lobby of this 113,500-square-foot student center features an exciting three-story atrium with circulation galleries overlooking the central grand stair. A skylight framing the lobby provides additional orientation, interest and natural light. A student fitness center on the second floor features an aerobic workout center, including a third-floor indoor track that circles the lobby.
A contemporary design and the use of brick ties this new structure to the traditional materials and architectural styles of existing campus buildings. Glass, curtainwall and metal panels are used in the structure. Building finishes include standard gypsum-board systems with upgrades, tile in the lobby and carpet in the offices. Combined acoustic and gypsum board grid is used throughout the lobby to balance reverberation and eliminate echoes.
This structure is the focus of campus life and planned for future growth; the third floor can be expanded over the floor below, with 10,000 square feet of shell space in the initial buildout.
The HVAC system uses air-handling units with hydronic heating and chilled-water cooling coils. A roof-mounted air-cooled rotary screw chiller provides chilled water for the system. The electrical system provides standard power to all areas. Building systems include fire alarm, lightning protection and telecommunications wiring.

Additional Information

Cost per Sq Ft

$134.72

Featured in

2002 Educational Interiors;2002 Architectural Portfolio

Interior category

Student Centers/Service Areas

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...