Goshen Intermediate School

Goshen, Indiana

Client

Goshen Community Schools

Area

190,000 sq.ft.

Total Cost

$44,900,000

Completion Date

07/2020

The Goshen Intermediate School project was conceived after months of study by a diverse group of stakeholders. They looked at the usage and capacity of the Goshen Community Schools’ existing K-5 elementary school buildings and its 6-8 middle school building. With the assistance of Barton Coe Vilamaa Architects & Engineers, the study group recommended adding an intermediate school for grades 5-6 as a first step to alleviate space and capacity challenges at all K-8 buildings.

The district and architect worked closely throughout design and construction, evaluating multiple building concepts, materials systems and alternatives to balance the budget and the educational needs of the district. For example, precast concrete sandwich exterior wall panels were compared with traditional load-bearing masonry construction, and precast panels were chosen for multiple reasons. The result of this careful planning and collaboration was a project delivered on time and on budget while meeting all of the district’s educational goals.

Additional Information

Cost per Sq Ft

$236.00

Featured in

2022 Educational Interiors Showcase

Interior category

Common Areas

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...