Fair Street Elementary School

Gainesville, Georgia

Firm

Robertson Loia Roof

Client

Gainesville City Schools

Area

103,965 sq.ft.

Total Cost

$15,026,182

Completion Date

10/2013

RLR worked with the Gainesville City School System to design a new elementary campus that would serve the needs of its growing student body. Because the replacement school also would serve as a community center, RLR gathered community input on the key functions and spaces that would be used after hours and on weekends.
The Fair Street Elementary School project called for demolishing the existing historic, 75-year-old facility. The new campus was designed with a two-story classroom wing that houses 45 classrooms, a kitchen, a media center, a gymnasium, a historical society classroom and an outdoor amphitheater.
The existing site is extremely limited in acreage and includes a complex terrain. Addressing these variables required the collaborative efforts of the school system and RLR’s civil and architectural planners.
The school’s integrated design is tailored to the community’s needs and the existing site’s challenges. Fair Street received EPAct Certification based upon the energy savings that RLR incorporated into the building design.

Additional Information

Capacity

700

Cost per Sq Ft

$145.00

Featured in

2015 Architectural Portfolio

AS&U Design Competitions