Edgemont Junior High School

Edgewood, Washington

Firm

Erickson McGovern Architects

Client

Puyallup School District

Area

81,065 sq.ft.

Total Cost

$12,061,980

Completion Date

08/2001

Edgemont Junior High School was designed to reflect the history of the original school.
It was built in 1938 with several renovations throughout the 1970s and 1980s. Over time, enrollments increased and the building deteriorated.
The new school was built with community, history and student use as a priority. The athletic facility can be closed off from the rest of the school for evening and weekend use by the community.
On top of the priority list was designing a vintage-style building. A clock tower was constructed above the entry; light fixtures were installed along the entrance walkway; and the original school sign was incorporated into the furnishings of the new building. A “talking wall” similar to those encountered in museum displays, was designed at the main entrance to the school. For staff and student safety, surveillance cameras have been wired throughout the school.
To meet environmental goals, thermal windows and four-pipe hot-water fan-coil units were installed. The windows are designed to maximize daylight.

Additional Information

Capacity

750

Cost per Sq Ft

$134.00

Featured in

2002 Architectural Portfolio

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...