Echo School Addition

Echo, Oregon

Client

Echo School District

Area

29,596 sq.ft.

Total Cost

$7,186,620

Completion Date

02/2020

Design Team
Architects West: Ed Champagne (Principal/Project Architect), Derek Miller (Project Manager), Keith Dixon (Landscape Architect); Eclipse Engineering: Brian Hanson (Structural); JTL Engineering: Mike Lippis (Mechanical); Conley Engineering: Mike Garretson (Electrical); FP Engnineering: Glen Satre (Fire Protection); Anderson Perry: Bill Vixie (Civil)

The Echo School serves grades K to 12 with an enrollment of 1,532 students. This project called for an addition programmed to incorporate educational use as well as community use into the building design. The addition was designed as a statement attesting to the viability and strength of the Echo community. Community-access programs include a fitness center, community assembly room, and associated serving kitchen. These spaces are available to the public during school hours, and the design provides separation within the addition. The overall design also added six classrooms and a sizable wood/metal shop as well as a new secure main entry, aligning the entire K-12 campus under one roof.

The small site posed design challenges: accommodating an imposing gymnasium structure on a small site with street frontage. To help soften the height of the structure, it was moved away from the street and surrounded by the fitness center and community room in the front and classrooms in the back.

Additional Information

Associated Firm

Kirby Nagelhout Construction, Jason Terry, Sr. Project Manager (GC/CM Contractor)

Capacity

1,530

Cost per Sq Ft

$242.00

Featured in

2020 Architectural Portfolio

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...