The architect worked with the district on this project, which added physical-education and athletic space to the north end of the existing high school. The addition is framed on the east by the district’s bus garage, on the north by a baseball field, and on the west by School Drive.

The 36,345-square-foot addition includes a two-station competition gymnasium with bleacher seating for 1,400 on four sides; four locker rooms— two physical education and two team; a 3,100-square-foot fitness center to house weight and cardio equipment, shared indoor/outdoor lobby that enables access to toilet rooms for events in the gymnasium, as well as football and baseball games; health/physical education/community classroom; and ample storage for physical education, athletics and outdoor programs.

The renovation of the existing high school includes conversion of the existing weightroom/fitness center to an agriculture classroom; renovation of an existing classroom to a wood-finishing room; an adaptation of the existing gymnasium to better support the performing arts; and HVAC improvements in the technology-education area.

Additional Information

Capacity

1,577

Cost per Sq Ft

$183.38

Featured in

2012 Architectural Portfolio

Product suppliers specified

Carpet by Mannington
Flooring by Mannington
Door Hardware by LaForce, Inc.
Doors by LaForce, Inc.
Paint/Wallcoverings by Sherwin-Williams
Athletic Equipment by Hufcor
Fire/Life-Safety Systems by Emerson
Roofing by Weather Guard Products
Load more

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...