East Houston Intermediate School

Houston, Texas

Firm

Archi*Technics/3, Inc.

Client

North Forest Independent School District

Area

107,100 sq.ft.

Total Cost

$9,105,008

Completion Date

06/2000

This building uses an intermediate school concept accommodating grades 5 and 6. It was constructed behind the existing school on five acres.
The educational program requires that each academic pod have eight classrooms clustered around a central commons to provide interaction among classrooms or to conduct small presentations.
All pods provide separate restrooms for students and teachers; a workroom; computer server room; and a mechanical, electrical and custodian room.
The art and science rooms, computer lab, media center and administration offices are centralized for access by both grade levels. Each grade has separate access to the gym-natorium, community room and dining area. Closed-circuit television, Internet access and cable television is available throughout the entire school.
Construction systems include a pre-engineered building, concrete slab-on-grade, brick veneer, split-face block, glass block and a standing-seam metal roof with R-30 insulation.
The building is conditioned with a four-pipe system, air-handling units and air-cooled chillers. Individual VAV units provide each classroom with better control and thermal comfort.

Additional Information

Capacity

1,000

Cost per Sq Ft

$85.00

Featured in

2001 Architectural Portfolio

AS&U Design Competitions