Dr. Justina Ford Elementary School

Littleton, Colorado

Firm

Jacobs

Client

Littleton Public Schools

Area

91,919 sq.ft.

Total Cost

$31,454,224

Completion Date

08/2021

Design Team
MOA Architecture (Architect); Roche Constructors, Inc. (Contractor)

Dr. Justina Ford Elementary is a newly constructed school that opened in August 2021 and is designed to educate over 650 students. Each grade-level classroom wing has a large group space at its center with two smaller breakout spaces, including glass operable walls. This large group area is also connected to each classroom via garage-style, overhead doors. This design provides sightlines for teachers, flexibility for student learning, and a collaborative environment. The school is also outfitted with flexible furniture designed for 21st-century learning environments, creating a symbiotic relationship with the construction elements. All pieces of furniture are easily movable and adjustable. The building has mountain views from the upper-level corridor, views of the two outdoor learning environments, and natural lighting in each classroom. The classroom lighting controls are specifically programmed for testing, reading, audiovisual instruction, and energy efficiency.

Additional Information

Capacity

650

Cost per Sq Ft

$342.00

Featured in

2021 Architectural Portfolio

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...