Crozier Middle School (Work in Progress)

Inglewood, California

Firm

Dougherty + Dougherty Architects LLP

Client

Inglewood Unified School District

Area

104,000 sq.ft.

Total Cost

$18,000,000

Completion Date

09/2019

Crozier Middle School is on a flat urban site adjacent to the Inglewood Civic Center. The site has been home to a public school facility since the founding of the first Inglewood School. The aging facilities are being replaced in phases, resulting in a new campus with a modernized 500-seat theater to remain.
The new school is designed for 1,400 students in grades 6 to 8. The academic curriculum supports a magnet program in math/science and the performing arts. Joint-use agreements are proposed for the theater and for the in-town playfields and basketball courts.
The design recognizes the need for a high-density, two-story response that is safe and secure. Exterior building materials have been selected for durability and sustainability, while balancing a human-scale aesthetic among the surrounding civic buildings. The building design respects the scale of the surrounding civic center buildings while reflecting the creativity and self-determination of the young students. District staff, campus faculty and parents actively participated in the design process.

Additional Information

Capacity

1,290

Cost per Sq Ft

$173.00

Featured in

2002 Architectural Portfolio

Category

Work in Progress

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...