Crane Country Day School Wolf Theatre Renovation

Santa Barbara, California

Firm

John Sergio Fisher & Associates, Inc.

Client

Crane Country Day School

Area

7,661 sq.ft.

Total Cost

$3,829,025

Completion Date

10/2023

The project scope consists of the renovation of the existing Cate Hall Theatre (new seating and seat risers, interior finishes and acoustical treatments) and the addition of a new lobby with a wheelchair lift and a control room. The theater, mechanical and electrical systems are also new.

Architectural improvements: New lobby and control room addition with spiral stair and wheelchair lift; new seating risers and storage underfeed; new accessibility ramps inside the audience chamber and outside the building; new light lock from the lobby.

Theater system upgrades: New main drape and border; new front of house motorized electrics batten; new theatrical lighting control and distribution and reuse of electrical receptacles at stage; new AV system.

Structural improvements: structural framing and foundations for new addition; structural support for seating and risers; reinforcing electrical structure and new framing for ramp into stage.

Mechanical upgrade: new VRF system and heat pump systems to serve the stage, audience chamber and drama classroom.

Electrical upgrades: new electrical wiring and conduit for added systems and HVAC; new power outlets and lighting to comply with Title 2 including 2 new electrical panels.

Additional Information

Cost per Sq Ft

$500.00

Featured in

2024 Educational Interiors Showcase

Category

Renovation

Interior category

Auditoriums/Music Rooms

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...