Chittenango High School

Chittenango, New York

Firm

Beardsley Design Associates Architecture, Engineering & Landscape Architecture, PC

Client

Chittenango Central School District

Area

264,800 sq.ft.

Total Cost

$8,835,000

Completion Date

12/1997

Chittenango Central School District challenged the architects to remedy crowding and disrepair in a 1950s vintage high school. Problems included science classrooms without computers, a cafeteria undersized for the student population, and a cramped gymnasium.
A constrained site minimized the ability to expand, forcing a creative reworking of the existing footprint.
The project introduced a seven-classroom science-technology suite; a 1,000-seat gymnasium addition to accommodate the entire student body; and locker rooms, cafeteria, kitchen and auditorium renovations.
The main entry doors constitute an area of compression, heightening the unfolding of the extended public space into the interior lobby of the facility. The focus of the lobby is a new central stair, developed from the two-story space recovered from the relocated gymnasium.
The architects discovered that in one location the original building had been designed to accommodate a future second floor. The design of the new science-technology suite took advantage of this condition. The program of the science suite incorporated transitions in teaching styles, creating areas for simultaneous lecture, laboratory and computer-simulated learning.

Photographer: ©David Revette Photography

Additional Information

Capacity

1,000

Cost per Sq Ft

$91.00

Featured in

1998 Architectural Portfolio

AS&U Design Competitions