Brandon High School

Ortonville, Michigan

Firm

French Associates

Client

Brandon School District

Area

292,475 sq.ft.

Total Cost

$27,527,084

Completion Date

08/2008

Brandon High School was an outdated rural facility that needed significant improvement. To supplement a successful athletic program, a significant portion of the renovations to the facility was focused on outdoor play fields.

A unique iron gate, painted Brandon Eagle Blue, ushers spectators into this impressive space. The entrance is flanked by ancillary buildings housing a large concession stand with an adjacent ticket booth and restroom facility. The stadium features a new 2,800-square-foot locker room, bleacher seating for 4,000 spectators, and an elevated press box. The new playing field features a turf football and soccer field, synthetic running track, long-jump pit, high-jump area, pole-vault pad and shot-put field.

Interior renovations include a gymnasium addition and a new weightroom.

Additional Information

Capacity

1,300

Cost per Sq Ft

$91.24

Featured in

2009 Architectural Portfolio

Category

Renovation

Product suppliers specified

Doors by Detroit Door & Hardware
Door Hardware by Detroit Door & Hardware
Bleachers/Grandstands by Southern Bleacher Co
Kitchen Equipment by Stafford-Smith
Plumbing by Delta Faucet
Locks by Ingersoll Rand
Lockers by Steel Equipment Corp
Auditorium/Assembly Furniture by Irwin Seating
Cafeteria Furniture by Great Lakes Case & Cabinet
Lounge Furniture by Great Lakes Case & Cabinet
Load more

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...