Area

230,000 sq.ft.

Total Cost

$89,000,000

Completion Date

09/2015

Associated Firms: DVL Consulting Engineers (Mechanical, Electrical, Plumbing & Fire Protection), AKRF (Site Civil and Acoustic Engineers), EME Consulting Engineers (Sustainability), SavkromInc. (Vertical Transportation), Assume Vivid Astro Focus (Artist for Public Art Installation)

Design team
John Ciardullo (Principal); Charles Heaphy (Partner); Georgia Stokes (Project Executive); Neil Bienvenu (Project Architect); William Riley (Discipline Lead); George Varthalamis (Field Architect); Ardeny Goris (Structural); Brian Anderson, Kyunghee Lee, Matthew Lombardi (Architects)

Beacon High School is one of New York City’s premier schools, distinguished by its “dynamic inquiry-based curriculum,” which focuses on arts and technology. The search for a permanent home for the school resulted in the discovery of a six-story former factory building that was being used as a book storage for the New York City Public Library in the Hell’s Kitchen neighborhood of Manhattan.
Much of the existing concrete structure showed signs of deterioration, but the design team felt saving the original mushroom columns and floor slabs was critical. These elements were resurfaced to reflect the existing structure of the building. Corridors and classrooms weave through this original structure, enabling students and staff to perceive indications of the building’s former use.
To adapt the existing building for the needs of a modern high school, a seventh-floor addition provides space for a 432-seat performing arts theater and a regulation-sized gymnasium. Traditional steel frame construction with diagonal bracing was used for the rooftop addition as a lighter alternative to concrete. Castellated smart beams with long span metal deck are used in both the gymnasium and auditorium that provides the flexibility needed to create large open spaces without the interruption of columns.
By adapting a nearly abandoned city building for use as a public high school, the architects provided a critical amenity to a rapidly changing neighborhood. The school helps enable the far west side of Manhattan to continue its residential transformation.

Additional Information

Capacity

1,500

Cost per Sq Ft

$387.00

Citation

Adaptive Reuse Citation

Featured in

2016 Architectural Portfolio

Category

Adaptive Reuse

Product suppliers specified

Carpet by Patcraft
Flooring by Armstrong World Industries
Ceilings by Tectum
Ceramic Tile by Dal-Tile
Door Hardware by Sargent
Door Hardware by ASSA ABLOY
Door Hardware by Zero International
Doors by Curries
Elevators by Columbia Elevator
Insulation by ROXUL
Movable Partitions/Walls by Modernfold
Paint/Wallcoverings by Sherwin-Williams
Windows by Graham Architectural Products
Lighting & Accessories by Lightolier
Lighting & Accessories by Visa Lighting
Lighting & Accessories by Elliptipar
Lighting & Accessories by WideLite
Lighting & Accessories by Holophane
Fire/Life-Safety Systems by Edwards Systems Technologies
Locks by Stanley
Washroom Fixtures by American Specialties
Washroom/Shower Partitions by Stern-Williams Co. Inc.
Bleachers/Grandstands by Sheridan Seating
HVAC Units by Mitsubishi
HVAC Units by Trane
Whiteboards / Markerboards / Chalkboards by AARCO Products
Lockers by ASI Storage Solutions
Auditorium/Assembly Furniture by Seating Concepts
Science Furniture by CiF Lab Solutions
Washroom Accessories by American Specialties
HVAC Units by Innovent
HVAC Control Devices by Innovent
Draperies/Blinds by Draper
Library/Media Center Furniture by Sentry Technology
Walls/Wall Materials by Cladding Corp.
Lighting & Accessories by Winona Lighting
Acoustics/Sound Systems by International Cellulose
Acoustics/Sound Systems by Golterman
Load more

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...