Barnard College, Altschul Lehman Auditorium Renovation

New York, New York

Firm

Kevin Hom + Andrew Goldman Architects

Client

Barnard College

Area

2,500 sq.ft.

Total Cost

$1,400,000

Completion Date

09/2002

The project scope renovated an existing facility into an auditorium with full audiovisual capability for use in science class instruction, special assemblies, and lecture and film presentations.
The design incorporates all the control flexibility that such a technically sophisticated space requires. The auditorium’s audio/video technology permits the speaker to control the system from the front of the room. Wall-mounted video cameras record events in the auditorium or send images to the media control room for wider distribution. Audio is handled by two audio subsystems: program audio and speech audio. Plug-in microphones record student audio and send signals to the media control center for distribution.
The wall treatment was conceived as an acoustic baffle that would soften the resonance of the hall to enable audience participation and interaction with speakers.
Specialty lighting provides spot downlights and theatrical stage lighting. The lighting is configured to work as low-level background for students to take notes for lecture presentations and seminars.

Additional Information

Capacity

233

Cost per Sq Ft

$560.00

Featured in

2003 Architectural Portfolio

Category

Renovation

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...