Bard High School Early College DC

Washington, District of Columbia

Firm

Perkins Eastman

Client

District of Columbia Department of General Services | DC Public Schools

Area

108,200 sq.ft.

Total Cost

$81,890,593

Completion Date

08/2023

Design team
Sean O’Donnell (Principal in Charge); Mary Rose Rankin (Project Manager); Omar Calderon (Design Principal); Kristina Vidal (Senior Project Architect); Hui Sheng (Project Architect); Blair Davenport (Interiors)

This project marks the transformation of an obsolescent, open-plan elementary school building to support an innovative early college high school program. The dramatic transformation of this building creates a healthful, high-performance learning environment by leveraging a net-zero energy process that has resulted in this building becoming one of the nation’s most energy-efficient high school facilities.

The goal for the campus — the first early college program in the District of Columbia east of the Anacostia River — was to create a cutting-edge facility that enhances equity, promotes intellectual challenges, and nurtures the next generation of environmental stewards. This project aimed to provide an innovative facility that not only upholds Bard DC’s impressive record of a 98.4% graduation rate and an 82.4% associate degree attainment rate, but also enhances it.

The design of the school includes an assortment of indoor and outdoor spaces that metaphorically and literally connect to Bard’s mission and vision. It is a testament to the architect’s commitment to creating educational spaces that are catalysts for learning and growth.

Additional Information

Associated Firm

R. McGhee & Associates; Daniel Curry Architect

Capacity

500

Cost per Sq Ft

$757.00

Featured in

2024 Architectural Portfolio

Category

Renovation

Interior category

Pre-K/Early Childhood Education

Product suppliers specified

Flooring by Roppe
Physical-Education Flooring by Robbins Sports Surfaces
Cabinets by Russwood
Ceilings by CertainTeed
Door Hardware by Allegion
Doors by Washington Architectural Hardware
Doors by Special-Lite
Insulation by Owens Corning
Movable Partitions/Walls by National Gypsum
Paint/Wallcoverings by Sherwin-Williams
Roofing by Carlisle SynTec
Skylights by Oldcastle Moduline
Windows by Oldcastle Moduline
Card Systems by Intel
Drinking Fountains by Murdock
Hand-Drying Equipment by Dyson
Washroom Fixtures by Sloan Valve
Washroom/Shower Partitions by Bradley Corporation
Scoreboards/Clocks by Daktronics
Communications Systems by Electro-Voice
Clocks/Time Management by Sapling
HVAC Units by Taco
HVAC Control Devices by Siemens Building Technologies
IAQ Devices by Siemens Building Technologies
ADA/Compliance Equipment by Bobrick
Card Systems by Allegion
Card Systems by Schlage
Kitchen Equipment by Metro
Laundry Equipment by Speed Queen
Lockers by Penco Products
Whiteboards / Markerboards / Chalkboards by Forbo Flooring Systems
Benches/Site Furnishings by Landscape Forms
Paving by Monumental Stone Works
Lighting & Accessories by Musco Sports Lighting
Physical-Education Flooring by Shaw
Waste Receptacles by Marathon Equipment Company
Load more

AS&U Design Competitions

The ultimate tribute to education design excellence. If selected for publication, this distinctive...

Have an exceptional project that deserves national recognition? Want to show your best work to the...