Hebron High School

Lewisville, Texas

  • FIRM

    SHW Group

  • CLIENT

    Lewisville Independent School District

  • AREA

    239,000 sq.ft.

  • TOTAL COST

    $22,573,550.00

  • COMPLETION DATE

    6/1998

By breaking construction into five phases that could be scheduled according to the school’s immediate student-enrollment needs, the district was able to provide top-quality facilities for students without incurring additional operating costs. The school opened with the first three phases complete. Phases four and five will include classroom additions and ADDITIONAL INFORMATIONCOST PER SQ FT$94.45FEATURED IN2000 Architectural Portfolio 800-seat auditorium.

The Main Street corridor houses the library media center, administration and the dining space. This bright, colorful and voluminous corridor is filled with natural light and is the essence of the school’s warm and inviting character. Main Street also is decorated with classic early-20th-century streetlamps.

For security purposes this school contains an innovative double entry-way that lands all pedestrian traffic in an entry vestibule. This vestibule is part of the main office and therefore allows administrators to maintain constant supervision over all visitor traffic. Visitors cannot enter the main building without being granted access by the office staff.

All activity spaces are isolated from academic areas to enhance student safety and to minimize noise in the classroom.

Note: Total cost is construction only.