College of Charleston, TD Arena

Charleston, South Carolina

  • FIRM

    BetschAssociates, Inc.

  • CLIENT

    College of Charleston

  • AREA

    187,710 sq.ft.

  • TOTAL COST

    $41,937,500.00

  • COMPLETION DATE

    6/2009

This 187,710-square-foot, 5,000-seat athletic center was planned to replace the existing basketball arena and provide support areas for the athletic programs including locker rooms, athletic offices, weight-training facility, sports- medicine area, practice court, racquetball courts, classrooms and exercise deck. The project was phased to maintain ADDITIONAL INFORMATIONCAPACITY5,000COST PER SQ FT$223.00FEATURED IN2011 Architectural PortfolioSUB CATEGORYSports Stadiums/Athletic Facilities of the existing basketball court throughout construction.

The most distinctive feature of the building is the intimacy of the arena bowl. The compact site required the upper seating bowl to be placed over the concourse to achieve the required seating capacity. This feature provides the impressive scale of a larger arena. The proximity of the seating to the floor, the upper seating bowl and the open concourse all maintain the intimate scale of the original court and provide a unique fan experience.

The entire building was designed to preserve the scale of the historic brick wall, the building at 307 Meeting Street, and the adjacent existing buildings. The arched truss roof for the hospitality suite was used to convey the desired fieldhouse image.