Conant High School

Hoffman Estates, Illinois

  • FIRM

    ARCON Associates

  • CLIENT

    Township High School District 211

  • AREA

    88,700 sq.ft.

  • TOTAL COST

    $15,592,000.00

  • COMPLETION DATE

    8/2008

Curriculum demands and increased student enrollment created the need for major additions and remodeling work at this northwest suburban district. The study resulted in an expansion plan of Conant High School.

A new music suite was constructed at the southeast corner of the building and includes a band ensemble room, a chorus ensemble room, practice rooms, storage ADDITIONAL INFORMATIONCOST PER SQ FT$176.00FEATURED IN2009 Educational InteriorsINTERIOR CATEGORYCommon Areas and a music library. The former music suite, situated partly on the basement level of the building, was inaccessible to persons with disabilities. Demolition of the existing music suite made way for the construction of a new, state-of-the-art science department with 15 new science labs of all disciplines, prep rooms, storage rooms and a new science department office.

The main feature of the building is a two-story lobby/student assembly area containing a “green building technologies”-themed exhibit displaying various LEED components of the building, including photovoltaic energy collection for supplemental electricity, solar thermal collection for supplemental domestic water heating, a green roof design for water management, a wind turbine for supplemental electricity, and a geothermal heating system using the Earth’s constant core temperature as a heating and cooling source.