New Tech High @ Coppell

Coppell, Texas

  • FIRM

    Stantec Architecture

  • CLIENT

    Coppell Independent School District

  • AREA

    62,700 sq.ft.

  • TOTAL COST

    $2,233,519.00

  • COMPLETION DATE

    8/2008

How do you provide a customized environment that embraces a new digital world and provides opportunities for students to integrate technology with education in a collaborative manner? Leaders at Coppell Independent School District reached out to the community, and a committee was formed to make recommendations that were both practical and progressive.

The design had ADDITIONAL INFORMATIONCOST PER SQ FT$35.62FEATURED IN2009 Educational InteriorsINTERIOR CATEGORYInterior Renovation accommodate a radical shift from the classroom layout in the existing elementary school that was renovated for the project. By strategically removing walls in some locations and opening up others with glass, the design transforms the spaces from stand-and-deliver classrooms to energized, multi-use spaces. Certain rooms open out to hallways for collaboration and teaming. An open plan, movable furniture and a wireless network enable students to configure their own learning environments based on the size of the team and the project at hand.

“This design solution reflects a true appreciation of the changing educational needs of today’s students—all within a confined existing building and a very tight budget. Great job!”--2009 jury