C.V. Starr Intermediate School

Brewster, New York

  • FIRM

    DMR Architects

  • CLIENT

    Brewster Central School District

  • AREA

    56,000 sq.ft.

  • TOTAL COST

    $8,200,000.00

  • COMPLETION DATE

    1/1998

January 1998 was an exciting month for the students, faculty and administration of the Brewster Central School District. On a cold, rainy morning, nearly 600 enthusiastic fourth- and fifth-grade students and staff participated in the ceremonies officially opening the school. Challenging site conditions were overcome with the construction of ADDITIONAL INFORMATIONCOST PER SQ FT$146.00FEATURED IN1998 Educational InteriorsINTERIOR CATEGORYClassrooms 56,000-square-foot addition, which connects to the district’s middle school.

The educational program, developed in collaboration with the administration, staff and architects, includes 800-square-foot classrooms, media center, art room, cafeteria, gymnasium and discovery science classroom. Technology is integrated throughout the school with networked computer workstations and cable television connections in every classroom.

Custom-designed teaching stations in the classrooms boast brilliant colors and geometric shapes stimulating students’ minds, and achieving the district’s educational and functional objectives for technology and traditional instruction.

The design provides flexibility to conduct simultaneous instruction for two to three classes of almost 80 students. Wider corridors in key areas provide additional large-group instruction.

Photographer: ©Norman McGrath