Cheyenne Middle School

Edmond, Oklahoma

  • FIRM

    JHBR Architects, Inc.


    Edmond Public Schools

  • AREA

    110,503 sq.ft.





With the population shift and growth in west Edmond, the Edmond Public School District chose a 40-acre site adjacent to Mitch Park for a new middle school and elementary school.

Cheyenne Middle School houses more than 45 multipurpose educational rooms. The new school also includes a gymnasium, common areas and a large library/media center. The project was completed ADDITIONAL INFORMATIONCOST PER SQ FT$97.73FEATURED IN2003 Educational InteriorsINTERIOR CATEGORYLibraries/Media Centers three phases.

With its centralized location within the building, the library/media center is easily accessible to all grade levels. The media center was designed with a whimsical and airy atmosphere in mind to create a fun learning environment for students. The entrance to the media center captures the feel of the outdoors, with clerestory windows and suspended-cloud ceiling systems. This feel is continued into the media center with the use of sky-like colors and high ceilings.

Technology and innovation are key aspects of this project. A wall-mounted screen is connected to the librarian’s computer to allow a wide variety of media to be projected to students.