Edgemont Junior High School

Edgewood, Washington

  • FIRM

    Erickson McGovern PLLC

  • CLIENT

    Puyallup School District

  • AREA

    81,065 sq.ft.

  • TOTAL COST

    $12,061,980.00

  • COMPLETION DATE

    8/2001

Edgemont Junior High School was designed to reflect the history of the original school.

It was built in 1938 with several renovations throughout the 1970s and 1980s. Over time, enrollments increased and the building deteriorated.

The new school was built with community, history and student use as a priority. The athletic facility can be closed off from the rest of ADDITIONAL INFORMATIONCAPACITY750COST PER SQ FT$134.00FEATURED IN2002 Architectural Portfolio school for evening and weekend use by the community.

On top of the priority list was designing a vintage-style building. A clock tower was constructed above the entry; light fixtures were installed along the entrance walkway; and the original school sign was incorporated into the furnishings of the new building. A “talking wall” similar to those encountered in museum displays, was designed at the main entrance to the school. For staff and student safety, surveillance cameras have been wired throughout the school.

To meet environmental goals, thermal windows and four-pipe hot-water fan-coil units were installed. The windows are designed to maximize daylight.