Battle Creek Central High School

Battle Creek, Michigan

  • FIRM

    Fanning Howey

  • CLIENT

    Battle Creek Schools

  • AREA

    61,575 sq.ft.

  • TOTAL COST

    $7,928,015.00

  • COMPLETION DATE

    8/2001

Battle Creek Central High School is a circa-1907 building in historic downtown Battle Creek. Prior to its renovation, the school served 1,200 students in grades 10 to 12. A comprehensive modernization and expansion enabled the district to integrate ninth-grade students into the school and increase its capacity to 1,500.

In addition to 55,000 square feet of ADDITIONAL INFORMATIONCOST PER SQ FT$110.00CITATIONSilver CitationFEATURED IN2002 Educational InteriorsINTERIOR CATEGORYLibraries/Media Centers space, 11,000 square feet of new construction allowed for a dramatic expansion of the media center. Expansive, 18-foot-high windows in the media center were duplicated in the addition, along with ornate plaster pilaster and capital details. The two-story space features study areas, a conference room and computer labs.

A new 500-seat cafeteria and two new science labs also were added. The cafeteria features an a la carte menu and is accented by playful patterns, colors and lighting design. Careful attention was given to historic detailing throughout the modernized space, while upgrading the facility to a 21st-century academic environment.

“Nice volume of space appropriate for a media center. Good blend of technology and effective circulation patterns.” 2002 Jury