Cheshire High School, Alterations and Additions

Cheshire, Connecticut

  • FIRM

    DeCarlo & Doll, Inc.

  • CLIENT

    Town of Cheshire Public Schools

  • AREA

    73,400 sq.ft.

  • TOTAL COST

    $8,020,000.00

  • COMPLETION DATE

    8/2000

The existing Cheshire High School consists of the original single-story 1953 building and multiple additions, with the last one completed in 1971.

The main goal of the project was to correct the space deficiencies of the school. The school had a capacity of 1,270 students but projections showed enrollment would peak in 2003 at 1,460. The number of classrooms ADDITIONAL INFORMATIONASSOCIATED FIRMTrataros Construction, Inc.CAPACITY1,500COST PER SQ FT$109.00FEATURED IN2001 Architectural PortfolioSUB CATEGORYRenovation inadequate; support areas, the cafeteria and band-rooms were too small; and the science areas did not meet curriculum requirements.

Validation of these requirements was completed through administration and staff interviews, and meetings with department heads, teachers and student representatives.

This project was completed in stages. It resulted in the construction of 13 classrooms, two computer labs and “The Commons,” a multipurpose area serving as a cafeteria annex during the reduced lunch-wave periods. A new band room was constructed to house the award-winning Cheshire Ram Band. Three of the existing science labs were renovated to meet instructional requirements in physics and chemistry.

The project achieved its intended goals on a limited site by saddling the existing structure and providing a second story over the original one-story building. The addition, which provides an additional 51,000 square feet to the high school, provides a new welcoming face for the school.

To encourage community use of the building, major assembly spaces developed in this plan were clustered around the new main entry, which was relocated to the front of the building from its previous remote location.